PDF Only
$35.00 Free Updates Upto 90 Days
- AD01 Dumps PDF
- 189 Questions
- Updated On November 18, 2024
PDF + Test Engine
$60.00 Free Updates Upto 90 Days
- AD01 Question Answers
- 189 Questions
- Updated On November 18, 2024
Test Engine
$50.00 Free Updates Upto 90 Days
- AD01 Practice Questions
- 189 Questions
- Updated On November 18, 2024
How to pass Blue Prism AD01 exam with the help of dumps?
DumpsPool provides you the finest quality resources you’ve been looking for to no avail. So, it's due time you stop stressing and get ready for the exam. Our Online Test Engine provides you with the guidance you need to pass the certification exam. We guarantee top-grade results because we know we’ve covered each topic in a precise and understandable manner. Our expert team prepared the latest Blue Prism AD01 Dumps to satisfy your need for training. Plus, they are in two different formats: Dumps PDF and Online Test Engine.
How Do I Know Blue Prism AD01 Dumps are Worth it?
Did we mention our latest AD01 Dumps PDF is also available as Online Test Engine? And that’s just the point where things start to take root. Of all the amazing features you are offered here at DumpsPool, the money-back guarantee has to be the best one. Now that you know you don’t have to worry about the payments. Let us explore all other reasons you would want to buy from us. Other than affordable Real Exam Dumps, you are offered three-month free updates.
You can easily scroll through our large catalog of certification exams. And, pick any exam to start your training. That’s right, DumpsPool isn’t limited to just Blue Prism Exams. We trust our customers need the support of an authentic and reliable resource. So, we made sure there is never any outdated content in our study resources. Our expert team makes sure everything is up to the mark by keeping an eye on every single update. Our main concern and focus are that you understand the real exam format. So, you can pass the exam in an easier way!
IT Students Are Using our Blue Prism Accredited Developer Exam Dumps Worldwide!
It is a well-established fact that certification exams can’t be conquered without some help from experts. The point of using Blue Prism Accredited Developer Exam Practice Question Answers is exactly that. You are constantly surrounded by IT experts who’ve been through you are about to and know better. The 24/7 customer service of DumpsPool ensures you are in touch with these experts whenever needed. Our 100% success rate and validity around the world, make us the most trusted resource candidates use. The updated Dumps PDF helps you pass the exam on the first attempt. And, with the money-back guarantee, you feel safe buying from us. You can claim your return on not passing the exam.
How to Get AD01 Real Exam Dumps?
Getting access to the real exam dumps is as easy as pressing a button, literally! There are various resources available online, but the majority of them sell scams or copied content. So, if you are going to attempt the AD01 exam, you need to be sure you are buying the right kind of Dumps. All the Dumps PDF available on DumpsPool are as unique and the latest as they can be. Plus, our Practice Question Answers are tested and approved by professionals. Making it the top authentic resource available on the internet. Our expert has made sure the Online Test Engine is free from outdated & fake content, repeated questions, and false plus indefinite information, etc. We make every penny count, and you leave our platform fully satisfied!
Frequently Asked Questions
Question # 1
Which of the following flows can you not create in Blue Prism? (select 2 responses)
A. Option A
B. Option B
C. Option C
D. Option D
Question # 2
When a process is running in Control Room which of the following functions within the process can be accessed from Control Room to request the process to stop?
A. Stop()
B. IsStopRequestec?
C. IsStopRequested()
D. StopNow()
E. Stop?
F. StopNow?
Question # 3
A Blue Prism solution interfaces with an internet application called HappyWeb. There is a test website available for development, and a training site available for user acceptance testing, and there is the production she available for processing live cases in HappyWeb. Which of the following is true?
A. All development and testing MUST be done using the production site. This is because the test and training websites might not mirror production exactly.
B. A local text file should be used to easily configure the details of the HappyWeb website to be used in each Blue Prism environment.
C. An Environment variable should be used to store the HappyWeb URL.
D. Three different versions of object that launches the HappyWeb website will need to be created and maintained, one for each environment.
Question # 4
When entering an option within the Training Order system the relevant option number is entered into the Option number field as below The Option number input field has been spied in Blue Prism:The following attribute set has been returned by Application Modeller:Which Attribute can be un-ticked to ensure consistent visibility of the element to Blue Prism?
A. Window Text
B. Visible
C. Screen Visible
D. Class Name
Question # 5
Consider the following flow in an object:Which of the following statements are true?
A. There just needs to be a wait stage after the start stage to correct this action.
B. There should be a wait stage after every stage in this flow (i.e. after the navigate, read, write stages.
C. If during testing in object studio this flow works, no additional wait stages should be added as they will slow the interface down.
D. There should be an intelligent wait stage after the start stage and after any stage that cause the application we are interfacing with to change
Question # 6
Study the following image showing pan: of the flow within a process:What problems do you see with the process flow? (select 2 responses)
A. There is a missing Recover stage on one of the routes through the flow.
B. There is a missing Resume stage on one of the routes through the flow.
C. The Retry Count is not being incremented for each retry.
D. If an exception is thrown in the Cancel Reservation page and is allowed to bubble up to be caught by the Recover stage, the Create Reservation action won't be retried.
Question # 7
Which of the following indicates a case has been worked successfully in a Work Queue?
A. Option A
B. Option B
C. Option C
D. Option D
Question # 8
If you change a session variable when will the new value be available to the process?
A. Immediately
B. Next time a new case is taken from a WQ
C. Next time resource PC starts
D. Next time the process starts
Question # 9
The Order System application has been successfully launched and Blue Prism has navigated the application to the following screen:There is a requirement to ensure this screen is in focus before any further interfacing is done with the screen. Which is the correct configuration to ensure the New Order screen is in focus?A)C)
A. Exhibit A
B. Exhibit B
C. Exhibit C
D. Exhibit D
Question # 10
Consider the following flow in an object:Which of these statements is true?
A. The flow shown in the diagram is correct, the wart stages are all adding a high level of robustness to the action
B. The wait stages after read and write stages should be removed they are not required and are lowing the flow down
C. The wait stages after read stages should be removed, the wart stages after write stages should be left because the application will have been changed
D. Only the first wait stage in this flow is required, all the other wait stages should be removed.
Question # 11
The following Calculation Stage uses the Today function to get the current date as a date value and place it in a data item entitled "Today".Which of the following statements is correct?
A. If the data item "Today" is configured with a Data Type of Text, an exception will be thrown on execution of the calculation stage
B. If the data item "Today" is configured with a Data Type of Date, an exception will be thrown on execution of the calculation stage
C. If the data item "Today" is configured with a Data Type of DateTime, an exception will be thrown on execution of the calculation stage
D. None of these statements are correct
Question # 12
Consider the following process flow: What will happen when the process runs?
A. The flow will pass through calculation stage "A"
B. The flow will pass through calculation stage "B"
C. The flow will pass through calculation stage "C"
D. An exception will be thrown
Question # 13
What will be the outcome after the page has run?
A. Data Item Output Value contains A
B. Data Item Output Value contains B
C. Data Item Output Value contains C
D. An Internal Exception will be thrown
Question # 14
Which of the following indicates a case in a Work Queue is an exception?A)
A. Option A
B. Option B
C. Option C
D. Option D
Question # 15
How many Start Stages can a sub-page in a Process have?
A. 0
B. 1
C. 2
D. Any Number
Question # 16
Consider the following process flow from the Main Page of a process in Process Studio:Thinking about the standard Blue Prism Process Templates, what is wrong with this Main Page process flow?
A. There is nothing wrong with the Main Page flow shown in the image, it is a copy of Blue Prism's standard Process Template
B. The Stop? decision stage should be removed from the process flow, as Stop time is Configured either within the Scheduler process are stopped via Control Room.
C. The Mam Page process flow is too high level For better visibility of the process logic the flow steps hidden m the sub-pages should al be on the main page instead.
D. There is no exception handling on this Main Page so any exceptions that "bubble up" will cause the process to terminate rather than exceptions being handled correctly.
E. The Reset Global Data page is not required because sub-page within a process should always use input parameter rather than global data items. There should be no global data to reset.
Question # 17
Which of the following statements regarding the use of Work Queues are correct? (select 2 responses)
A. Control Room allows filtering of the displayed queue items using exact tags and by using wildcards
B. Wildcards are not allowed in the Tag Fitter property of the Work Queues business object Get Next Item action
C. Work Queue item Status can only be set to Completed or Exception
D. Tags can be used allow flexibility in the order items are worked within a single Work Queue
Question # 18
The Work Queue 'Account Closure has a number of Pending Items which may be tagged as "Current", "Saving" or "Loan" What is the correct configuration to get the next item from the queue that is tagged either "Current" or "Loan"?
A. Configure "Current or Loan" in the Tag Filter parameter
B. Configure "-Saving" in the Tag Filter parameter
C. Configure "Current; Loan: in the Tag Filter parameter
D. Configure "Current + Loan'" in the Tag Filter parameter
Question # 19
Study the following configuration Which of the following statements is correct?
A. When the configuration is run in Control Room, it will become stuck in an infinite loop
B. When the configuration is run in Control Room, it will become stuck in an infinite loop until the 'Switch' Session Variable is changed to True in System Manager
C. When the configuration is run in Control Room, it will become stuck in an infinite loop until the 'Switch' Session Variable is changed to True in the Control Room
D. When the configuration is run in Control Room, it will fail with an internal error on the first execution of the 'Switch?' stage with the error: Decision did not result in a yes/no Answer:
Question # 20
When building a solution to use Tags within a Work Queue, which of the following statements is correct true?
A. Adding a tag requires an item to be locked
B. Adding a tag requires an item to be locked if there are multiple resources working the same queue
C. Adding a tag does not require an item to be locked
Question # 21
Consider the following process flow:What is the problem with this flow?
A. There is nothing wrong with this flow.
B. The exception handling in this flow can be removed because an Attach action in a navigate stage should always work if configured correctly
C. The Attach Block should be enlarged to also include the Waited Long Enough decision stage
D. The flow contains a recover stage and a route from it without a resume stage. This will cause internal errors on future exceptions thrown in the same session.
E. The 0.5 second wait stage should be removed so that the retries can be performed at full speed.
Question # 22
How can an environment variable value be updated? (select all that apply)
A. By using the Internal - Environment Variables business object
B. By changing the Blue Prism Server configuration
C. By updating the value in Control Room
D. By updating the value in Credential Manager.
E. By updating the value in System Manager
Question # 23
Study at the following diagram which is an extract from a sub-page of a process being tested in Process Studio:There are no breakpoints in the "Access Customer Account" subpage however there is an error. What will happen if you choose to step out (SHIFT+ F11) when debugging the process?
A. The process will work all stages in the "Access Customer Account page until the error is thrown and then focus would move to the breakpoint at "Get Customer Details" stage.
B. The process will work all stages in the 'Access Customer Account1 page until the error is thrown and then focus would move to the "Recover 1 stage
C. The process will work all stages in the "Access Customer Account' page until the error is thrown and then focus would move to the stage containing the error on the "Access Customer Account" page,
D. The process will work all stages in the "Access Customer Account" page until the error is thrown and then focus would move to the "Exception 1 stage.
Question # 24
Study the following process flow on the Main Page of a process where the intention is to preserve the current exception.What is wrong with the design?
A. The exception handling is not within an Exception Block.
B. The exception caught by Recover2 will not be preserved by the Re-Throw Exception stage
C. The Send Alerts process will never be run
D. Because the flow is on the Main Page of the process there should not be a ‘Re-Throw' Exception stage as there are no parent/calling pages for the exception to bubble up' to.
Question # 25
Study at the following diagram which is an extract from a process being tested in Process Studio:There are no breakpoints in the "Access Customer Account" subpage however there is an error What will happen if you choose to step over (F10) when debugging the process?
A. The process will work all stages in the; Access Customer Account" page until the error is thrown and then focus will move to the "Get Customer Details" stage.
B. The process will work all stages in the "Access Customer Account" page until the error is thrown and then focus will move to the "Recover 1 stage.
C. The process would will all stages in the "Access Customer Account' page until the error is thrown and then focus will move to the stage containing the error on the ''Access Customer Account" page.
D. The process will work all stages in the 'Access Customer Account" page until the error is thrown and then focus would move to the appropriate recover stage on the 'Access Customer Account" page.
Question # 26
When considering an element's attributes in Application Modeller which of the following statements are true? (select all that apply)
A. The attributes are provided to Blue Prism by the Target System
B. The initial selection of attributes made by Blue Prism will always be the optimum attribute set for the element
C. The list of attributes may vary from application type to application type
D. Selected attributes are shown as ticks in the Match column of Application Modeller
Question # 27
In which of these scenarios is it ok not to use a Blue Prism work queue as part of your Blue Prism solution?
A. A Blue Prism work queue is not required for simple linear processes that do not work multiple cases.
B. A Blue Prism work queue should always be used. It eliminates the risk of contention and allows you to gracefully pause the queue at any time.
C. A Blue Prism work queue is not required if the business process interfaces with a Work List system with in-built capability to ensure multiple users cannot work the same case at the same time
D. A Blue Prism Work Queue decreases the scalability of the solution and therefore should only be used for complex scenarios such as multi-day processing.
Question # 28
A screen contains four buttons, Find, Save, Close and New. When the buttons are spied, the attributes are identical except for the Window Text attribute. The values for the Windows Text attribute are Find' for the Find button. 'Save' for the Save button, Close' for the Close button and New’ for the New Button. The Dynamic Button element has been spied and has the following attributes set:What additional configuration is required to ensure the Close button is selected by the Navigate stage?
A. Set the Mouse Button value to Close'
B. The Params button must be selected and the parameter configured to override the Window Text attribute value to 'Close'
C. It is not possible to select the Close button using the Dynamic Button element because the value is set to 'Find in the Application Modeller
D. A new element is required with the Window Text value set to "Close and the Match Type set to equal
Question # 29
Which of the following Stages can be found in Process Studio AND Object Studio?
A. Option A
B. Option B
C. Option C
D. Option D
Question # 30
Consider the following process flow: What will happen when the process runs?
A. The flow will pass through calculation stage "A"
B. The flow will pass through calculation stage "B"
C. The flow will pass through calculation stage "C"
D. An exception will be thrown
Question # 31
When designing a Blue Prism solution a Blue Prism architect must respect the requirement that no customer data is visible within the Blue Prism database. Consider these possible design alternatives: 1. No customer data in the work queue 2. Encrypt the data in the work queue 3. Switch off all stage parameter logging Which combination of the above will guarantee that no customer data is visible in the Blue Prism log file?
A. 1 only
B. 2 and 3
C. 1 and 3
D. None
Question # 32
A process contains only 4 stages Study the following process flow:The data Item Result' is a number data item with an initial value of 2. The calculation stage is configured as follows:Following the execution of the Perform Calculation stage, which of the following is true?
A. The data item Result will contain 3
B. The data item Result will contain 5
C. The process will throw an exception
D. None of these statements are correct
Question # 33
Examine the following process flow:The Loop Orders loop is configured to loop through the Orders collection. How Many times will the 'Process Order' page be executed?
A. 1
B. 15
C. The loop will be infinite
D. It's impossible to tell. There is no loop counter.
Question # 34
The data item "Loop Counter" is a number data item and has an initial value of 0. The data item "Max Loops" is a number data item and has an initial value of 10. The two stages are configured as follows:How many times will the Loop Again stage be executed when the page is executed?
A. 10
B. 9
C. 11
D. The loop will be infinite
Question # 35
Which of the following can you perform in me System -> Workflow area of Blue Prism? (select all that apply)
A. View the contents of a Work Queue
B. Refresh a Work Queue
C. Encrypt a Work Queue
D. create a Work Queue
Question # 36
Examine the following process flow:The Orders Collection contains the following dataThe Saved Quantity Data Item is configured as a number with the initial value 0. The Loop Orders stage is configured to loop though the Orders collection. The Get Quantity stage is configured as follows:What will the data item Saved Quantity contain after the execution of the page?
A. 4
B. 5
C. 1
D. 10
Question # 37
You identify an element in Application Modeller but when you highlight or use that element Blue Prism gives you an error message saying that duplicate elements were found. Which of the following statements is true?
A. It is common for duplicate elements to be found based upon the attributes that are ticked by default using the Blue Prism product. Time needs to be spent experimenting with the attribute ticks until a unique, reliable, and consistent selection of attributes are found.
B. It will not be possible to interface with the element in a unique way. You will need to use Surface Automation techniques for this element.
C. A code stage interface will need to be created and used for this application, this will give you more flexibility to interact with the application elements.
D. You will need to make the attributes you have selected dynamic. This will allow your flow to loop around, incrementing the attribute value until the correct element is found and used.
Question # 38
Examine the Process below:An error has been encountered on Page 1 and the exception has bubbled up to be recovered in the Recover 1 stage. If there is an error in the Calc 1 stage which path will the Process take?
A. The Process will continue to the Resume 1 Stage
B. The Error will cause the Process to terminate
C. The Error will be recovered in the Recover2 Stage
D. The Error will cause the Process to jump to the End Stage
Leave a comment
Your email address will not be published. Required fields are marked *